Warning, Electrical, iid electronic units, Indoor draft hood installation – Pentair Pool and SPA Heater PowerMax User Manual
Page 20
P/N 471048
Rev. G 1-22-04
20
Screw
(2 PLC's)
HEATER
Top Cover
Adaptor
Draft Hood
Installation (contd.)
INDOOR DRAFT HOOD INSTALLATION
1. Take out the louvered outer top piece after first
removing the sheet metal screws, attaching it to
the cabinet.
2. Install the adaptor (vent kit).
3. Install the top cover (vent kit).
4. Install the draft hood (vent kit).
Use the provided screws to secure the vent assembly.
ELECTRICAL, IID ELECTRONIC UNITS
Electrical Rating
60 Hz
115 V.A.C. or 230 V.A.C.
50/60 Hz 208 V.A.C. or 240 V.A.C.
NOTE
If any of the original wiring supplied with this
heater must be replaced, installer must supply
(No. 18 AWG 105° C. U.L. approved AWM low
energy stranded) copper wire or it's equivalent.
In Canada: wires must be CSA approved.
WARNING
The heater must be electrically grounded and
bonded in accordance with local codes or, in the
absence of local codes, with the latest national
electrical codes ANSI/NFPA No. 70.
In Canada: CSA standard C22.1 Canada Electrical
Code Part 1 and/or local codes.
Always use crimp type connectors when connecting
two wires.
This heater is equipped with a reversible junction box
to allow line voltage to be wired from either side.
Figure 24.
Figure 26.
Figure 25.
Transformer Wiring Instruction