beautypg.com

Premier Mounts 9533-004-001-07 User Manual

Page 5

background image

PRC

Installation Manual

Page 5

AST-2446 Installation

If the AST-2446 will not be used to

mount the PRC, then a suitable piece

of threaded pipe can be used. These

instructions will tell the user how to

mount an AST-2446 to the ceiling. If

a custom piece of threaded pipe is

used, it is the responsibility of the

user to determine how best to mount

the PRC and pipe.



Single Stud Installation – Wood screws
(Commercially Available)
Solid Surface Installation – Concrete wedge
anchors (Commercially Available)

1. Secure the ceiling plate to the ceiling
structure.
2. Use suitable hardware (commercially

available) depending on your installation

environment to secure the two (2, or 4,

depending on the structure) mounting

points found on the ceiling plate to the

ceiling

structure.

Four Outer Points
are for Solid Surface
Installation

Two Inner Points
are for Single Stud
Installation







3. To adjust the height of the AST-2446,

remove the adjustment screws (Page 4),

determine the desired height, and re-insert

the adjustment screws to lock the AST-2446

into the desired position.

Ceiling Surface

Ceiling Plate

Mounting
Hardware