12.0

Completion

34

© Baxi Heating UK Ltd 2007

12.1

Completion

1. Hinge the facia panel upwards and refit the case front

panel. Tighten the securing screws (Fig. 52).

2. Instruct the user in the operation of the boiler and

system, explaining the operational sequence.

3. Carefully read and complete all sections of the

Benchmark Commissioning Checklist at the rear of this

publication that are relevant to the appliance and

installation. These details will be required in the event of

any warranty work. The publication must be handed to

the user for safe keeping and each subsequent regular

service visit recorded.

4. For IE, it is necessary to complete a “Declaration of

Conformity” to indicate compliance with I.S. 813. An

example of this is given in I.S. 813 “Domestic Gas

Installations”. This is in addition to the Benchmark

Commissioning Checklist.

5. Hand over the Users Operating, Installation and

Servicing Instructions, giving advice on the necessity of

regular servicing.

Fig. 52

Facia Panel

Case Front Panel