7

3. Fill with fresh water until the water begins to pour out of
the

drain.

4. Replace the cap. Press the cap onto the trap until the cap

makes contact with the drain.

5. Replace the retaining screw.

ƽ WARNING

The condensate trap (FIG. 1) must be
filled with water during all times of boiler
operation to avoid flue gas emission from
the condensate drain line. Failure to fill
the trap could result in severe personal
injury or death.

PVC TEE ASSEMBLY

(FACTORY SUPPLIED)

TO FLOOR

DRAIN

2” PVC CAP WITH

BLOCKED DRAIN SWITCH

RETAINING

SCREW

CONDENSATE FROM

HEAT EXCHANGER

Figure 1 Condensate Trap

Condensate disposal

1. This boiler is a high efficiency appliance that produces

condensate.

2. The side of the boiler has a 1/2 inch PVC union for

connection of a 1/2 inch PVC pipe (FIG. 2).

3. Slope condensate tubing down and away from the

boiler into a drain or condensate neutralizing filter.

Condensate from the Knight boiler will be slightly acidic
(typically with a pH from 3 to 5). Install a neutralizing
filter if required by local codes. Call your qualified service
technician to inspect the boiler and system.

A Neutralizer Kit is available from the factory

(Kit #3087). Call your qualified service technician to

install.

4. Install the 1/2 inch PVC tee assembly (shipped with the

unit) as shown in FIG. 2. Call your qualified service
technician to inspect the boiler and system.

5. Leave the top of the 1/2 inch tee OPEN. This is needed as

a vacuum break.

6. Do not expose condensate line to freezing temperatures.

7. Use only plastic tubing or piping as a condensate drain

line (FIG. 2).

Use materials approved by the authority
having jurisdiction. In the absence of
other authority, PVC and CPVC pipe
must comply with ASTM D1785 or D2845.
Cement and primer must comply with
ASME D2564 or F493. For Canada use
CSA or ULC certified PVC or CPVC pipe,
fittings, and cement.

8. A condensate removal pump is required if the boiler is

below the drain. When installing a condensate pump,
select one approved for use with condensing boilers
and furnaces. The pump should have an overflow
switch to prevent property damage from condensate
spillage. Call your qualified service technician to inspect
the boiler and system.

NOTICE

NOTICE

To allow for proper drainage on large
horizontal runs, a second line vent may
be required and tubing size may need to
increase to 1 inch.

The condensate line must remain
unobstructed, allowing free flow of
condensate. If condensate is allowed to
freeze in the line or if the line is obstructed
in any other manner, condensate can exit
from the boiler tee, resulting in potential
water damage to property. Call your
qualified service technician to inspect
the boiler and system.

1/2" PVC TEE ASSEMBLY
(FACTORY SUPPLIED)

1/2" PVC UNION
(FACTORY SUPPLIED)

FLOOR DRAIN OR
DRAIN PAN

NEUTRALIZER KIT

Figure 2 Condensate Disposal