beautypg.com

Optional blower installation instructions – Langley/Empire RH-25-6 User Manual

Page 14

background image

Page 14

12821-6-0406

DRB-1 For Vented Room Heaters

Models

RH-25-(1, 2, 4, 5, 6) and RH-35-(1, 2, 4, 5, 6)

Direct Vent Wall Furnaces DV-25-(1, 2)SG and DV-35-(1, 2)SG

Installing Optional DRB-1 Blower

1. For RH-25-(1, 2, 4, 5, 6) and RH-35-(1, 2, 4, 5, 6), remove

casing front.

1. For DV-25-(1, 2)SG and DV-35-(1, 2)SG, remove casing

front and heat shield.

2. When facing appliance, insert blower assembly into the left

section of the casing (adjacent to the combustion chamber).

3. For RH-25-(1, 2, 4, 5, 6) and RH-35-(1, 2, 4, 5, 6), route cord

set through opening in casing back. The opening in casing

back is located adjacent to gas control.

3. For DV-25-(1, 2)SG and DV-35-(1, 2)SG, route cord set

through opening in casing bottom. The opening in casing

bottom is located beneath gas control.

4. Align the (2) screw holes on the inner side panel and the (2)

screw holes on casing back with the (4) clearance holes on

the blower assembly. Attach blower assembly to the casing

back and inner side panel with (4) #10 x 1/2" (13mm) screws

provided. The blower assembly must be attached first to the

casing back and then to the casing side panel.

5. For RH-25-(1, 2, 4, 5, 6) and RH-35-(1, 2, 4, 5, 6), replace

casing front.

5. For DV-25-(1, 2)SG and DV-35-(1, 2)SG, replace heat shield

and casing front.

Attention: Wiring harness on blower is factory assembled and

installed. If wiring harness becomes disassembled use the follow-

ing steps to reassemble the wiring harness.
1. Attach (1) pin terminal from black (hot) wire, smooth insulation

on cord set to (1) socket terminal on fan control assembly.

2. Attach (1) pin terminal from black (neutral) wire, ribbed insu-

lation on cord set to (1) socket terminal from white (neutral)

wire on motor.

3. Attach (1) pin terminal on fan control assembly to (1) socket

terminal from black (hot) wire on motor.

4. Attach green ground wire beneath one of the #10 x 1/2" (13mm)

screws on the blower housing.

Fan Control

The automatic fan control is located in the switch box. The switch

box is attached to the front of the blower assembly. The switch

box is adjacent to the combustion chamber. The fan control is a

non-adjustable automatic type. The fan control will require between

5 and 10 minutes of main burner operation before the fan control

“closes” and activates the blower. The blower will continue to run

between 5 and 10 minutes after the main burner shuts off, before

the fan control “opens” and deactivates the blower.
Wiring

The appliance, when installed, must be electrically grounded in

accordance with local codes or, in the absence of local codes, with

the National Electrical Code, ANSI/NFPA 70 or Canadian Electrical

OPTIONAL BLOWER INSTALLATION INSTRUCTIONS

COMBUSTION

CHAMBER

SWITCH BOX

BLOWER ASSEMBLY

This manual is related to the following products: