Water connections, Primary / secondary piping, Installation & service manual – Lochinvar 45 User Manual
Page 29
Primary / Secondary Piping
SOLUTION
BOILER
BACKFLOW
PREVENTER
PRESSURE
REDUCING VALVE
PRESSURE
GAUGE
TEMPERATURE / PRESSURE
GAUGE
AIR
SEPARATOR
EXPANSION
TANK
BALL VALVE
(TYPICAL)
UNION
(TYPICAL)
PRESSURE
RELIEF VALVE
DRAIN POINT
(TYPICAL)
MAKE UP WATER
FROM
SYSTEM
12"
NOT TO EXCEED
APART
BOILER
CIRCULATOR
SYSTEM
CIRCULATOR
TO
SYSTEM
SYSTEM SUPPLY
SENSOR
DRAIN
Y-STRAINER
(RECOMMENDED)
Figure 4-4_Primary / Secondary Piping of a Single Boiler
4
Water connections
(continued)
29
Installation & Service Manual
This manual is related to the following products:
See also other documents in the category Lochinvar Water boiler:
- KNIGHT XL KBN800 (6 pages)
- SD (2 pages)
- Copper Fin II CF-1261 (1 page)
- EBS-SUB-02 (2 pages)
- Commercial Water Heater (2 pages)
- 999 - 750 (72 pages)
- JR-SUB-07 (2 pages)
- POWER-FIN PB/PF 2001 (4 pages)
- Squire SSS041 (20 pages)
- Knight Heating Boiler 81-286 (48 pages)
- 1302 (2 pages)
- CH/CF/CP 300-750 (4 pages)
- 000 (80 pages)
- Copper-fin CW-360 (1 page)
- CP-5M-4/08 (52 pages)
- 500 (68 pages)
- 000 - 260 (52 pages)
- TNR-I&S-02 (20 pages)
- ARMOR 150 - 800 (36 pages)
- KNIGHT KB-500 (1 page)
- PB 502 thru 1302 (4 pages)
- PB-1302(M9) (1 page)
- MDN 030 (2 pages)
- 495 (52 pages)
- Hot Water Generator (24 pages)
- Heating Boilers KB 400 thru 801 (4 pages)
- SYNO 1.3 (16 pages)
- SQUIRE SIT119 (24 pages)
- Commercial Gas Glass Lined Tanke Type Water Heater CG200 (28 pages)
- COPPER-FIN CB-0745 (1 page)
- 0402-0752 (2 pages)
- 1.3 (56 pages)
- RPV-I&S (16 pages)
- KNIGHT 400 (48 pages)
- KNIGHT 210 (20 pages)
- Power Fin PF-0502 (M9) (2 pages)
- COPPER-FIN II 402 - 2072 (16 pages)
- 752 (16 pages)
- WATER HEATERS (12 pages)
- EFFICIENCY+ E B N 150 (2 pages)
- Sync Condensing Boiler 1.5 (56 pages)
- EB 150 -- 300 (4 pages)
- CW495-2066 (2 pages)
- CREST 2.5 (60 pages)