beautypg.com

Important – Lennox International Inc. MONTECITO ESTATE MONTEST User Manual

Page 10

background image

1. Combustible material must be installed flush

with the fireplace. It may not project in front

of and on the fireplace (i.e. the steel facade

of the fireplace) (Figure 14).

2. Non-combustible materials such as brick,

stone or ceramic tile may project in front of

and onto the fireplace facing (Figure 13).

MANTEL & FACING

The mantel must be installed at least 56”

(1143 mm) above the base of the fireplace

(Figure 13).

Figure 13

IMPORTANT

The facade must be removable

once installed. The facade is

designed to overlap any facing

material installed on the front of

the fireplace. If thicker material

is installed, use the facade as a

template and make sure it can be

easily removed for servicing.

FACING

1

3

4

5

6

2

1

2

7

3

4

1. Fireplace

2. Front of fireplace

3. Wood frame (2” x 3” min)

4. Drywall

5. Tiles

6. Rock board or other

7. Brick

Fireplace Frame Section

(Top View)

Figure 12

...............

...............

...............

...............

...............

...............

...............

...............

...............

...............

...............

...............

...............

...............

...............

...............

...............

...............

...............

...............

..........

Mantel

Rock Board

or Other

Noncombustible

Facing

56”

Drywall

2” X 3” Min.

Spacer

Mantel & Facing

(Side View)

Figure 15

Drywall

2” X 3” Min.

Spacer

Noncombustible Facing

Only non-combustible material

should be superposed or project-

ing over the front of the fireplace.

Figure 14

50”

Min.

Fireplace Blower

The fireplace comes equipped with a heat acti-

vated blower. It is located in the bottom of the

fireplace, towards the back. It uses 120 V and

must be connected to the main electrical circuit

by a qualified electrician. For connection, use the

electrical box supplied with the unit located on

the bottom right corner of the fireplace.

If you wish to adjust the blower speed, the

variable speed control (VRUW) provided must

be installed in line with the wiring. Again, use

a qualified electrician for installation.

If the blower requires servicing,

1- Remove the doors and decorative facade.

2- Remove the screw located below the blower

motor that holds it to the back of fireplace.

3- Pull the blower out of the unit through the

square hole located in the front bottom right

corner.

HOT AIR DUCTING INSTALLATION

The Montecito Estate™ is approved for use with

a Gravity Kit:

Gravity Kit

The gravity kit is designed for double hot air

outlets and includes:

(See Figure 16)

- 2 telescopic lengths 8” I.D.

- 2 90º elbows 8” I.D.

- 2 hot air outlet kits (grill and frames)

- 2 adaptors

See Gravity Kit Accessories on Page 20.

Only the blower available with the fireplace can

be used with the gravity kit.

For safe installation, the gravity kit must meet

the following requirements:

Minimum height* 68” (1,727 mm)

Maximum length See Figure 17

* The height of the louver must be measured

from the base of the Montecito Estate to the

middle point of the louver.

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

10