beautypg.com

Installation instructions, Check operation of bake/broil burners, Air shutter adjustment for bake and broil burners – LG LDG3015ST User Manual

Page 13

background image

13

INSTALLATION INSTRUCTIONS

To check ignition of the Bake burner, follow the steps

below:

1) Remove all packing from inside the oven cavity.

2) Press "Bake" (350 will be shown in the display).

3) Press Start.

It may take between 30 and 90 seconds for the burner

to start heating.

To check ignition of the Broil burner, follow the steps

below:

1) Press "Broil" ("Hi" will be shown in the display).

2) Make sure the door is closed.

3) Press Start.

It may take between 30 and 90 seconds for the burner

to start heating.

NOTE: Do not try and light either the bake or broil

burners during a power outage. The range has an

electrical ignition system and can not be used

without power.

8. CHECK OPERATION OF BAKE/BROIL BURNERS

The range comes from the factory with air shutters adjusted for proper air flow for natural gas.

If converted to LP, follow the instructions provided in the conversion kit to properly adjust the air shutters.

LP conversion must be performed by a qualified technician.

9. AIR SHUTTER ADJUSTMENT FOR BAKE AND BROIL

BURNERS.

ENGLISH

This manual is related to the following products: