beautypg.com

Sidewall direct venting, Vent/air termination – sidewall – Lochinvar CREST 2.5 User Manual

Page 22

background image

Termination and fittings

1. The air termination must be oriented at least 12 inches

above grade or snow line as shown in FIG. 4-1, page
21.

2. Maintain the required dimensions of the finished

termination piping as shown in FIG. 4-1, page 21.

3. Do not extend exposed vent pipe outside of the

building more than what is shown in this document.
Condensate could freeze and block vent pipe.

4. Stainless steel terminations are designed to penetrate

walls with a thickness up to 9.25 inches of standard
construction.

All vent pipes and air inlets must
terminate at the same height to avoid
possibility of severe personal injury,
death, or substantial property damage.

Multiple vent/air terminations

1. When terminating multiple Crest boilers terminate

each vent/air connection as described in this manual
(FIG. 4-4).

ƽ WARNING

22

Installation & Operation Manual

4

Sidewall direct venting

Vent/air termination – sidewall

4'

4'

Figure 4-2 Clearance to Doors and Windows

VENT TERMINATION

IF LESS THAN 10’

36” MIN.

FORCED AIR
INLET

AIR TERMINATION

Figure 4-3 Clearance to Forced Air Inlets

Prepare wall penetrations

1. Air

pipe

penetration:

a. Cut a hole for the air pipe. Size the air pipe hole as

close as desired to the air pipe outside

diameter.

Vent pipe penetration:
a.

Cut a hole for the vent pipe. For either combustible

or noncombustible construction, size the vent pipe

hole per the vent manufacuturer’s instructions.

2. Install the vent and air intake piping. Seal all gaps

between the pipes and wall with RTV silicone sealant.

3. Seal all wall cavities.

ƽ CAUTION

Sidewall venting commercial products will
result in large exhaust plumes in cold
climates. Consideration should be taken
when locating in proximity to windows,
doors, walkways, etc.