3 - connecting the ird ground wire, 4 - installing the switchplate, 3 connecting the ird ground wire – KVH Industries TracVision S3 User Manual
Page 23: 4 installing the switchplate

2-12
A Guide to TracVision L3/S3
2.3.3 Connecting the IRD Ground Wire
A grounding wire (Cable #32-0583-50) has been provided to
connect your IRD to a suitable ground and protect the system.
Attach the grounding wire to any suitable screw on the rear
panel of the IRD with a good contact with the IRD chassis. The
other end should be connected to a suitable ground, ideally the
ground connector on the switchplate (see Figure 2-15).
2.3.4 Installing the Switchplate
After completing the switchplate wiring process, you must install
the switchplate itself. This process, detailed in the following
steps, is illustrated in Figure 2-16.
1. Fit the switchplate assembly and support frame
into the panel cutout made in Step 2 of
“Connecting System Components,”
mounting surface.
2. Drill out four
5
⁄
32
" (4 mm) holes in the countersunk
settings in the switchplate support frame.
3. Drill four
3
⁄
32
" (2.5 mm) holes in the mounting
surface using the countersunk holes in the support
frame as the template. Secure the support frame
and switchplate assembly to the mounting surface
using four #6 self-cutting screws.
4. Snap the front cover into place to cover the screws
and support frame.
5. Reinstall the vehicle fuse removed in Step 1 of
Section 2.3.2, “Connecting to Vehicle Power.”
3.82"
(97 mm)
2.36"
(60 mm) 2.05"
(52 mm)
3.19"
(81 mm)
A. Panel Cutout
B. Support Frame
C. Front Cover
5
/
32
" (4 mm)
3
/
32
" (2.5 mm)
Figure 2-16
Mounting the Switchplate
Support Frame and Front Cover
Before securing the switchplate to
the mounting surface, be sure to
strain-relieve the wires connecting
to the switchplate connectors.
Several tie-wraps have been
provided to aid in strain-relieving
the wires.