beautypg.com

Sanus Systems AFV48 User Manual

Page 2

background image

Step 1: Foot Assembly

Thread a Foot (c) into each 3” Pillar (h) until tight. Thread a Shelf Connector (a) into the other end of the 3” Pillar until tight. Repeat the
process for each remaining 3” Pillar. See Diagram 1 for assistance.

Diagram 1

a

h

c

Step 2: Add Bottom Shelf

Insert each Foot Assembly through the Bottom Shelf (k) as shown in Diagram 2.

Diagram 2

k

Step 3: Add 9” Pillars

Thread a 9” Pillar (i) onto each exposed Shelf Connector (a) until tight. Once the 9” Pillars are hand tight, thread a Shelf Connector
into the top of the four 9” Pillars. See Diagram 3 for assistance.

Diagram 3

a

i

a

k

Step 4: Add Middle Shelf

Place the Middle Shelf (k) on the 9” Pillars (i). A Shelf Connector (a) should be protruding above the Middle Shelf in each corner. Place
a Top Bolt (b) through the Middle Shelf and thread it into each middle pillar. See Diagram 4 for assistance. Tighten each Top Bolt with
the Allen Key (f).

Diagram 4

b

k

a