beautypg.com

Electrical tasks before spa delivery, Important – Sundance Spas Spas 880 Series User Manual

Page 10

background image

8

electrical Tasks Before Spa delivery

if installing a spa that is …

Then it must be …

240V (North America)

Hard wired to the power supply.

120V (USA only)

Plugged into a dedicated grounded outlet using the
GFCI cord supplied with the spa.

120V (Canada)

Hard wired to the power supply per CSA standards.

Continued on next page

General Electrical System Considerations

+

Before the installation of your spa begins, check with the local building
department to ensure this installation conforms to local building codes.

important

When installed in the United States, the electrical wiring of this spa
must meet the requirements of the National Electric Code (NEC)
and any applicable state or local codes. The electrical circuit must
be installed by an electrical contractor AND approved by a local
building/electrical inspector.

N

ever use an extension cord of any kind. Using an extension cord can

damage the spa equipment and void your warranty.

The Sundance Denali, Dover, and Tacoma North American models include
a 10 foot GFCI cord for plug-in 120V operation. Connect this cord directly
to a dedicated/grounded wall outlet. When a power cord over 10 ft. is
required, the spas must be hard wired in accordance with state and local
codes.

Before the scheduled arrival of your spa, it is necessary to set up the electrical
components. Use the checklist below to prepare for the spa’s installation.

r

Prepare the electrical connection for your spa based on one of the configurations listed

below. If necessary, refer to the Power Configuration tables for additional information by
model.

This manual is related to the following products: