Chapter 2 - operation, Unit operation overview, Notice – Stellar Industries 28000 User Manual
Page 7

Operation 3
1. Engage the PTO
A. Engage the parking
brake.
B. Place the transmission in
the Neutral position.
C. Make certain the PTO
switch is in the ‘off’
position.
D. Start the vehicle engine.
E. Depress the clutch on manual
transmission vehicles.
F. Engage the PTO switch for cable and air type
shifters. Turn on the dash switch for electrical
operated style. Consult vehicle owner’s manual
for location and operation of OEM style in-dash
PTO switch.
G. Slowly release the clutch on a manual
transmission vehicle.
H. Allow a few moments to warm the hydraulic
system oil. In cold weather, it is especially
important to let the system run for a few minutes
before operating.
2. Turn on Power to Crane
Activate power to the crane and outriggers. The
power switch is located on the control panel in the
vehicle cab.
3. Position Outriggers
Once the PTO is engaged, extend the outriggers
using the control levers or switches marked
‘outrigger’. These may be located on the crane
base or in the compartment under the crane.
4.Operate Crane
A. Turn on necessary power to the crane.
B. Activate toggle switch for desired crane function.
See the Hetronic Remote Manual for detailed
information.
C. When operation is complete, store remote
handle in a safe, dry location.
5. Store Outriggers
Retract outriggers using the control levers or
switches marked ‘outrigger’.
6. Turn Off Power to Crane
Deactivate power to crane and outriggers.
7. Disengage the PTO
A. On manual transmission vehicles, depress the
clutch pedal completely.
B. Disengage the PTO switch.
C. If vehicle is a manual transmission, release the
clutch pedal gradually.
Chapter 2 - Operation
PTO Switch
Job-Site Set-Up
thoroughly plan the lift before positioning the vehicle.
consider the following:
1. The vehicle should be positioned in an area free
from overhead obstructions to eliminate the need
for repositioning.
2. Position the vehicle so that it is impossible for any
portion of the equipment to come within the
minimum required safe distance of any power line.
Maintain a clearance of at least 10 feet between
any part of the crane, load line, or load, and any
electrical line or apparatus carrying up to 50,000
volts. One foot additional clearance is required for
every additional 30,000 volts or less. Remember to
allow for winds that cause power lines to sway. It is
recommended that a signal person be used when
the vehicle is set-up near power lines.
3. The vehicle should also be positioned on a firm
and level surface that will provide adequate
support for the outrigger loading. Use extreme
caution when setting up near overhanging banks
or excavations.
4. The parking brake must be set on the vehicle and
the drive axle disengaged before performing a
crane operation.
5. The outriggers must be extended to stabilize the
truck before beginning operation.
Unit Operation Overview
1. Engage the PTO
2. Turn on Power to Crane
3. Position Outriggers
4. Operate Crane
5. Store Outriggers
6. Turn Off Power to Crane
7. Disengage the PTO
This chapter contains information regarding the
operation of Stellar manufactured articulating
cranes. Please study the following pages to ensure
your familiarity with the operation process. This
understanding is vital to the safe and efficient
operation of the crane.
NOTICE
The parking brake must be fully engaged
in order to operate any Stellar
Equipment.