beautypg.com

5figure 3-4, Right side of cutter deck shown – Scag Power Equipment GC-STT-CSV User Manual

Page 7

background image

5

FIGURE 3-4

8. Install the blower assembly to the mounting

bracket and secure with the mounting pin and
hair pin. See Figure 3-4.

9. Align the blower assembly with the discharge

opening of the cutter deck. Tighten the
hardware for the mounting bracket. Install the
quick pin through the rear hole in the discharge
chute mounting bracket. See Figure 3-4.

10. Install the new belt cover from the cutter deck to

the blower mounting bracket and secure with the
original belt cover plastic wing nuts.

11. Install the belt to the spindle pulley. When

replacing the belt, see figure below.

FRONT SIDE
IDLER PULLEY

BACK SIDE
IDLER PULLEY

BLOWER
PULLEY

SPINDLE
PULLEY

12. Install the plastic belt cover and secure with the

plastic wing nuts. See Page 12 of the Illustrated
Parts List for proper installation.

RIGHT SIDE OF

CUTTER DECK SHOWN

(Note: Some parts not shown for viewing purposes.)

2006 GC-STC-V install art 3

BLOWER
ASSEMBLY

MOUNTING
BRACKET

MOUNTING PIN

TIGHTEN MOUNTING
BRACKET HARDWARE

HAIR
PIN

QUICK
PIN