Framing dimensions, Figure 3 figure 4 figure 5 – Superior CFST-CMN User Manual
Page 6

NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE.
6
CFST FRAMING SPECIFICATIONS
CFST APPLIANCE SPECIFICATIONS
A
22
³⁄₄" (578 mm)*
B
43" (1092 mm) Min.
C
43" (1092 mm) Min.
Framing Dimensions
Figure 3
Figure 4
Figure 5
C
A
B
Gas
Line
2 x 4 Wall
Framing Top View
*
¹⁄₂" (13mm) Required Air Space Clearance
Drywall
*
Gas Line
Energy Wall
2 x 4 Outside
Wall
Drywall
Drywall
*
Bracket
Bracket
Bracket
Bracket
*Note: Framing dimensions
calculated for
⁵⁄₈"
drywall finish.
Front View
(CFST)
42
³⁄₄"
(1086 mm)
40"
(1016 mm)
34"
(864 mm)
20"
(508 mm)
37
¹⁄₄"
(946 mm)
⁵⁄₈"
(16 mm)
Top View
3
¹⁄₈"
(79 mm)
5
¹⁄₂"
(140 mm)
31
³⁄₄"
(806 mm)
24"
(610 mm)
4"
(102 mm)
J Box/Gas Line
Opening (2 Places)
4
¹⁄₂"
(114 mm)
18"
(458 mm)
42"
(1067 mm)
Gas Line
Opening
4
¹⁄₈"
(105 mm)
12"
(305 mm)
*From Control Side
Left
End
View*
Right
End
View*