Prepare the hood – Sharp INSIGHTRANGEHOOD KB-0333K User Manual
Page 7
7
13
3 1⁄4” x 10” Ducted Discharge Only: Remove tape from
damper flap and attach Damper/Duct Connector over
knockout opening with screws removed in Step 4 under
“PREPARE THE HOOD”. Make sure damper Pivot is
nearest to top/back edge of hood.
14
7” Round Ducted Discharge Only: Re-install 7” Round
Duct Plate removed in Step #1 under “PREPARE
THE HOOD”. Install a 7” Round Damper (purchase
separately). Damper flap must open freely in direction
of airflow (away from range hood).
Note: To accommodate off-center ductwork, the Damper/
Duct Connector can be installed up to 1-inch on either side
of hood center or the 7” Round Duct Plate can be installed
up to 1⁄2” on either side of hood center. In extreme off-center
installations, one end of the duct connector may need to be
trimmed to clear the electrical cable clamp.
PREPARE THE HOOD
10
Re-install air chute and screw, re-connect wire harness
and replace light panel.
Note: Be careful not to trap wires between Support Fin
and light panel.
11
Remove appropriate Duct Knockout(s) from top or back
of hood.
12
Horizontal Discharge Only: Remove the Plate in front of
the horizontal discharge knockout. Cut the ties, lift plate
out, and discard plate. DO NOT REMOVE the Metal
Strip held in place with two screws.