Front panel led status indicator functions, Initial power up, calibration, and registration – Scientific Atlanta DPC2505TM User Manual
Page 29
4015259 Rev B
29
Front Panel LED Status Indicator Functions
Front Panel LED Status Indicator Functions
Initial Power Up, Calibration, and Registration
The following chart illustrates the sequence of steps and the corresponding
appearance of the cable modem front panel LED status indicators during power-up,
calibration, and registration on the network. Use this chart to troubleshoot the power
up, calibration, and registration process of your cable modem.
Note: After the cable modem completes step 8 (Registration Complete), the modem
proceeds immediately to step 9. See the chart in Normal Operations (on page 30).
Front Panel LED Status Indicators During Initial Power-Up, Calibration, and Registration
Step
1
2
3
4
5
6
7
8
Front Panel
Indicator
Power
Up
Self
Test
Downstream
Scan
Downstream
Signal Lock
Ranging
Requesting
IP Address
Registering
Registration
Complete
1
POWER
On
On
On On On
On On
On
2
DS 1
Blinks On
1 sec
Blinks
On On
On On
On
DS 2-3
Blinks On
1
sec
Off Off Off
Off Off
On when
wideband
operation is
enabled on
that channel
Off when
wideband
operation is
not available
on that
channel
3
US
Blinks On
1 sec
Off Off Blinks
On On
On
4
ONLINE
Blinks On
1 sec
Off Off Off
Off Blinks
On
5
LINK
Off On
1 sec
Off - When no devices are connected to the Ethernet or USB ports
On - When devices are connected to the Ethernet or USB ports
Blinks - When data activity is present
On