Roubleshooting – Southbend SEZ-5 User Manual
Page 27

SEZ S
ERIES
C
OUNTERTOP
S
TEAMERS
T
ROUBLESHOOTING
O
PERATOR
’
S
M
ANUAL
1181587
P
AGE
27
TROU
BLE
S
H
OOTI
N
G
Figure 10
Power Switch Continuity Check
Control Panel
Fuse Block
“ON” Light
Power Switch
1. DISCONNECT POWER AT CIRCUIT BREAKER.
2. Remove control panel.
3. Turn Lever to “ON” from “OFF” and to “OFF” from “ON” ensuring that the power switch is properly
actuated.
4. Remove power switch lead wires from fuse block (note wire locations).
5. Place test leads on “C” and “NO” lead wires as shown.
6. Check for continuity with lever in “OFF” position (there should be no continuity).
7. Check for continuity with lever in “ON” position (there should be continuity).
8. Repeat steps 5 - 7 with test leads between other pair of “C” and “NO” lead wires.
9. Place test lead on “NO” lead wire and other test lead on other “NO” lead wire.
10. Check for continuity with lever in “ON” position (there should be no continuity).
11. Reconnect wires or replace switch as necessary.