beautypg.com

Soleus Air KFHIP-09-OD User Manual

Page 18

background image

- 16 -




Install the Outdoor Unit

Air Purging and Leakage Test

1. Remove the flare nuts of charging end from gas valve.
2. Connect the charging hose in the middle to the vacuum

pump, then Low-pressure (Lo) end should be connected
to charging end of gas valve. (Shown in Fig. 9)

3. Open the vacuum pump to evacuate. When multi-meter

indicates 1 bar, fully tighten Lo handle of manifold valve
and stop evacuation. Keep it for over 15 minutes to ensure
the pressure is constant.

4. Remove bonnets of gas and liquid valve.
5. Slightly loosen core of liquid valve with hexagon wrench

until the pressure exceeds 0 bars.

6. Remove charging hose from charging end of gas valve and

screw the flare nuts of charging end.

7. Open cores of gas and liquid valve entirely by hexagon

wrench.

8. Tighten the bonnets of gas and liquid valve, and then test

whether there is any leakage or not.