Sanus Systems NF213 User Manual
Page 4

Sanus Systems 2221 Hwy 36 West, Saint Paul, MN 55113 04.06.06 (100043)
Customer Service: 800.359.5520. See complementary Sanus products at www.sanus.com
Step 4: Add Top Glass Shelf
Place four Glass Protectors (
L) evenly along the top of the Front Frame (A); then, add two Glass protectors to the top of
each Rear Support (
E).
Place the Top Glass Shelf (
G) onto the Glass Protectors as shown in Diagram 4.
Diagram 4
Step 5: Install Plastic Wire Covers
To install the Plastic Wire Covers (
F) insert one edge of the Plastic Wire Cover into one of the grooves in the Rear Support
(
E) as shown in the Top View of Diagram 5; then, insert the other edge of the Plastic Wire Cover into the adjacent groove in
the Rear Support. Repeat this procedure for the second Plastic Wire Cover.
NOTE: The Top Glass Shelf in Diagram 5 is shown as a cut-away view to provide greater detail of how the Plastic
Wire Cover attaches to the Rear Support.
Diagram 5
Top View
Plastic Wire
Cover (F)
Grooves in
Rear Support (E
)
E
H
F
L
G
L
A
E