Sanus Systems EFVS-II User Manual
Page 2

NOTE: Step 1 is necessary only if the EFAV-II assembly has been previously completed.
Step 1 - Remove existing Top Video Shelf
Remove the five Top Bolts and Top Video Shelf. Place the Video Shelf on a smooth soft surface, such a carpeted floor.
Diagram 1
C
Top Bolt
Step 2 - Install Shelf Connectors
Thread a Shelf Connector (
C) securely into the five 8˝ Pillars.
Diagram 2
Top Bolt
8˝ Pillar
Top Video Shelf
C
C
8˝ Pillar
8˝ Pillar