Inspection checklist – SPX Cooling Technologies MARLEY CLASS 800 User Manual
Page 26

26
Inspection Checklist
Date Inspected
Inspected By
Owner
Location
Owner's Tower Designation
Tower Manufacturer
Model No.
Serial No.
Process Served by Tower
Operation:
Continuous
Intermittent
Seasonal
Design Conditions
GPM
HW
°F
CW
°F
WB
°F
Number of Fan Cells
Condition: 1—Good 2—Keep an eye on it 3—Needs immediate attention
1 2 3
Comments
Structure
Casing Material
Structural Material
Fan Deck Material
Stairway?
Material
Ladder?
Material
Handrails?
Material
Interior Walkway?
Material
Cold Water Basin Material
Water Distribution System
Distribution Basin Material
Inlet Pipe Material
Inlet Manifold Material
Flow Control Valves?
Size
"
Nozzles — Orifice Diameter
"
Heat Transfer System
Fill
Drift Eliminators
Louvers
Use this space to list specific items needing attention: