beautypg.com

Contents of the shipping containers, Unpacking and clean-up, Assembly – Jet Tools JWL-1642EVS-2 User Manual

Page 9: Warning

background image

9

WARNING

Read and understand the entire contents of

this manual before attempting assembly or

operation!

Failure to comply may cause serious injury!

Contents of the Shipping Containers

1. Lathe
2. Cast

Legs

1. Tailstock
1. Headstock
1. Tool Rest Body
1. Tool

Basket

1. Guard

Assembly

1. Accessory

Package

1. Owner’s Manual & Warranty Card
Accessory Package Box

1. Live

Center

1. Rod for Live Center
1. Spur

Center

1. Index

Pin

1. Face

Plate

1. Rod for Face Plate
1. Knockout Rod Headstock
1. Tool

Rest

4. Adjustable

Feet

Tool Basket Bracket Hardware
2. Hex Sckt Cp Screws 5/16”-18 x 1-1/2”
4. Flat

Washers

5/16”

2. Set Screws 1/4”-20 x 1/4”
3. Hex Nuts 5/16”
1. Set Screw 5/16”-18 x 5/8”

Unpacking and Clean-Up


1. Remove the shipping container. Do not

discard any shipping material until the lathe
is set up and running properly.


2. Remove hex cap bolts from skid bottom and

move the lathe off the skid and into position.


3. Clean all rust protected surfaces with a

cleaner degreaser. Clean thoroughly under
the headstock, tailstock and tool rest body.

Assembly


1. Secure tool rest (A, Fig. 1) to tool rest body

(B, Fig. 1) by tightening handle (C, Fig. 1).


2. Slide the tailstock and tool rest to the

headstock end of the lathe bed. See
“Controls and Features” section of this
manual on how to move the tailstock and
tool rest.



Contents of Accessory Package



This manual is related to the following products: