beautypg.com

New construction, After the drywall is installed – JBL FM8SUB User Manual

Page 6

background image

New Construction

Step One:
Remove the grille from the
speaker frame.

Step Two:
Attach the proper mounting
bracket, marked and preset at
3/8", 1/2", 5/8", and 3/4" to the
speaker frame.

Step Three:
Determine the correct speaker
location.

1-1/2"

1-1/2"

1-1/2"

Step Four:
Nail or screw the speaker frame
assembly to the wall studs and
route the wires through the
frame opening.

Step Five:
Cut the drywall.

Step Six:
Connect the speaker wires to
the baffle assembly and install
baffle assembly in frame. Do
not overtighten the baffle
screws.

After the Drywall is Installed

Step Seven:
Replace the metal grille.

FM Series Owner’s Manual 7/22/98 9:27 AM Page 6

This manual is related to the following products: