Replacing switch and/or head tube, 7. replacing switch and/or head tube – Miller Electric XLT 185 User Manual
Page 29

OM-230 832 Page 25
7-7. Replacing Switch And/Or Head Tube
Ref. ST-800 795-C
Tools Needed:
19 mm
Remove handle
locking nut.
Slide handle.
Secure head
tube in vice.
Loosen jam nut.
Remove from vice
and turn head tube
out by hand.
Hand-tighten head tube into cable connector.
Place head tube in vice and tighten until
nuts are tight.
Remove from vice. Reposition handle and install
switch housing. Secure with handle locking nut.
Y
Turn Off welding power source
/wire feeder and disconnect gun.
Remove switch housing. Install new switch and
connect leads (polarity is not important).
Reassemble in reverse order. If replacing head
tube, continue to end of figure.
1
3
2
4
5
8
6
7
See also other documents in the category Miller Electric Tools:
- OM-2241 (32 pages)
- ICE-27C (36 pages)
- Arc Welding Power Source (4 pages)
- INVISION 456 CC (44 pages)
- Welder (132 pages)
- SS-75D12 (44 pages)
- Load Bank LBP-350 (2 pages)
- OM-193 084E (36 pages)
- 750MPa (2 pages)
- APT-1000 (20 pages)
- OM-220 390F (48 pages)
- 271 (48 pages)
- Welding (32 pages)
- DC (72 pages)
- OM-129 (70 pages)
- XLi (24 pages)
- S-64 (36 pages)
- ICE-27T (36 pages)
- PipePro 304 (76 pages)
- AA40GBU (28 pages)
- D-64 (40 pages)
- Auto Arc XLT 165 (48 pages)
- 185 DX (56 pages)
- S-32S (4 pages)
- Big 40 DC/TIG 55500 A (8 pages)
- Big Blue 600D (60 pages)
- Millermatic 140 (60 pages)
- pmn (36 pages)
- LMSW Series (2 pages)
- 1250 (46 pages)
- Trailblazer Pro 350 D (8 pages)
- TS (76 pages)
- S-22P12 (28 pages)
- 602 (40 pages)
- Axcess 300 (56 pages)
- MOG-400 (40 pages)
- WC-24 (20 pages)
- Big Blue 502P (64 pages)
- Dimension 1000 (44 pages)
- DS-74DX12 (52 pages)
- 350 VS (36 pages)
- 24A (32 pages)
- GA-16C (12 pages)
- Big Blue 502D (116 pages)
- OM-229 038D (36 pages)