MicroNet Technology EtherFast 100Mbps Fiber-Optic Adapter SP2515 SERIES User Manual
Page 6

2.
2.
2.
2.6
66
6 Test Program
Test Program
Test Program
Test Program
This test program verifies configuration of the adapter and assists
the isolation of any faults in operation. Test procedure are
optional, and will only be useful in the unusual event that there is
a fault, such as an interrupt number conflict among your
computer’s add on cards, If your installation provides normal
operation, you do not need these test procedures.
At your DOS prompt, type the following command:
a:\setup.exe
The opening screen is displayed as following:
View Current Configuration
Set Up New Configuration
Run Diagnostics
Exit NETSETUP
Choose
the Network Speed, 10 or 100M, and Transmission Mode, Full or
Half Duplex, and so on. Choose
the adapter test program.
Adapter test program includes:
The Power Management Test is available for WOL adapter only.
After choosing the
will display like,
Node ID.....…….: 00 e0 7d c0 00 01
Network Speed...: 100Mbps
I/O Base .………: E000H
Interrupt ..……...: 11
Full-Duplex …...: Disabled
Pass Count Fail Count
A. I/O Register
B. 100Mbps Loopback
C. 10Mbps Loopback
D. Cable Connection
P/N: 50075-0000