7.4.1
Tightening torques - Tie bolts, part No. 905
Material codes 10, 11, 12, 13 (casing: cast iron)
Pump size
Tightening torque Nm
Multitec 32
85
Multitec 50
140
Multitec 65
250
Multitec 100
395
Multitec 125
600
Multitec 150
700
Material code 20 to 30
(Casing: steel or stainless steel)
Pump size
Operating pressure
(bar)
Tightening torque
Nm
Multitec 32
150
Multitec 50
240
Multitec 65
All
430
Multitec 100
All
680
Multitec 125
1370
Multitec 150
≤ 40
1500
Multitec 150
> 40
2000
7.4.2
Reassembly of hydraulic system
Reassembly of the hydraulic system starts at the suction end
and proceeds towards the discharge end. It is advisable to
place the pump in vertical position for reassembly. The
sequence of reassembly does not pose any special problems
and shall be realized in accordance with the detailed sectional
drawing and list of components. The components shall be
re-installed in the same place as before dismantling.
A clearance of 0.7 to 1.2 mm shall be set between the last
impeller 230.1 or 230.3 and the balance drum 59-4 (or spacer
sleeve 525.4).
When tightening the tie bolts, proceed as follows:
- Tighten the nuts of tie bolts 905 gently, with the pump in
vertical position.
- Set the pump horizontally onto its feet on the assembly table.
- Tighten the nuts of tie bolts 905 in two steps (first step: 50% of
nominal torque, second step: nominal torque) in the sequence
1.4.2.3.
Fig. 37
7.4.3
Seals
Gland packing
Before re-packing, thoroughly clean the packing chamber and
the gland cover.
Packing rings must be inserted so that the cut
edge of each ring is displaced by approx. 90° to
120° in relation to the previous one.
Slip the pre-stressed packing rings onto the shaft protecting
sleeve, press home the first packing ring with the help of the
gland cover. Each packing ring must be pressed into the
packing chamber individually, using the gland cover.
On gland packings with lantern ring (for vacuum operation), the
lantern ring is mounted instead of the next to last packing ring
(the last packing ring is located in the seal chamber on the pump
side).
Tighten the gland cover by hand at first. Use a feeler gauge to
check the level position of the gland cover. It must be easy to
turn the rotor by hand.
Leakage is normal during pump commissioning. After approx. 5
minutes’ operating period, the amount of leakage can be
reduced by steadily tightening the nuts of the gland cover by 1/6
of a turn. Keep an eye on the amount of leakage and the water
temperature. It takes several hours of pump operation for the
gland to be adjusted completely. There must be a high leakage
rate during the running-in period.
Repeat this procedure every 5 minutes until a minimum value is
reached.
Dimensions in
Pump size
Dimensions in
mm
32 - 50 - 65
100
125
150
Packing
cross-section
10 j
12,5 j
16 j
Length of
packing cord
≈181
≈223
≈254
≈306
Number of
packing rings
5
6
Stuffing box housing
Pump size
d
i
d
a
l
32 - 50 - 65
45
65
50
100
56
80
60
125
66
90
72
150
78
110
96
Fig. 38 Gland chamber dimensions