beautypg.com

Check all connections, Final installation check list – Maytag MDE2400AYW User Manual

Page 11

background image

11

7.

Check All Connections:

At this time, make sure all gas connections (on gas models), exhaust and electrical
connections are complete. Plug dryer in, and check operation by using the check list
below.

FINAL INSTALLATION CHECK LIST

q

Dryer is plugged into electrical outlet and is properly grounded.

q

Exhaust ductwork is hooked up to dryer and all joints taped.

q

Plastic flexible duct is NOT used.

q

Rigid or stiff walled flexible metal vent material was used.

q

Dryer is level with all legs firmly on the floor.

q

Start dryer to confirm dryer runs, heats and shuts off.

q

Provide User Guide to consumer and demonstrate dryer operation.

HOUSEHOLD INSTALLATION ACCESSORIES

• Vent hood – 4” (10.16 cm) opening – 059129
• Aluminum pipe – 4” x 24” (10.16 cm x 60.96 cm) – 059130
• Aluminum elbow – 4” (10.16 cm) – 059131
• Aluminum window plate – 15” x 20” (38.10 cm x 50.80 cm) – 4” (10.16 cm) hole – 059134
• Flexible aluminum vent duct – 4” (10.16 cm) diameter – 38” (81.28 cm) length stretches to

8’ (2.44 cm) – 304353

• Clamp for flexible aluminum duct – 304630
• Exhaust duct kit for base or left side exhausting – 12001453
• Rectangular vent kit – 059144
• Dacron lint bag – 311353
• Anchor bracket kit – 303740
• Grounding kit – 12001875
• Power cords – 240 v, 30 A

4’ (121.9 cm) – 3-wire – 33001780
5’ (152.4 cm) – 3-wire – 33001822
6’ (182.9 cm) – 3-wire – 33001823

10’ (304.8 cm) – 3-wire – 33001838

4’ (121.9 cm) – 4-wire – 33001781
5’ (152.4 cm) – 4-wire – 33001824
6’ (182.9 cm) – 4-wire – 33001825

10’ (304.8 cm) – 4-wire – 33001838