Three phase power conditioners, Power-sure™ 700 – MGE UPS Systems POWER-SURE 700 User Manual
Page 22

2.6
Start-Up Sequence
WARNING:
THERE ARE DANGEROUSLY HIGH VOLTAGES PRESENT WITHIN THE
ENCLOSURE OF THE POWER SUPPLY SYSTEM. CAUTION MUST BE TAKEN
WHEN WORKING WITH THE ENCLOSURE. IT IS RECOMMENDED THAT ALL
WORK BE PERFORMED BY QUALIFIED ELECTRICAL PERSONNEL ONLY.
NOTE: INITIAL START-UP SHOULD BE PERFORMED WITH NO-LOAD ON THE SYSTEM.
1.
Re-install all panels that may have been removed during installation.
2.
Make sure the input circuit breaker is in the off position.
3.
Energize the primary building power.
4.
Turn on the main AC input breaker.
5.
Verify that the output voltage is within the specified range.
6.
Verify output phase rotation is correct.
7.
Turn the system off.
8.
Connect the loads one at a time and repeat Step 5.
Installation and Operation
Power-Sure™ 700 —
Three Phase Power Conditioners
2 — 8
86-108814-00 B01
- Pulsar EX 1000 (28 pages)
- 4.5 kVA (32 pages)
- 1100 (196 pages)
- EPS 8000 (54 pages)
- S EXB 2500 (22 pages)
- Pulsar Extreme 3200C (28 pages)
- ESV 22+Rack (24 pages)
- GES-801L (22 pages)
- Comet EX 7 RT 3:1 (38 pages)
- EX 11RT (72 pages)
- Galaxy PW (44 pages)
- 3 (34 pages)
- Pulsar TM 30 (18 pages)
- 22+ EB 22 (44 pages)
- 1500C (28 pages)
- Rackmount PDU (36 pages)
- Pulsar Esprit 313.5 kVA (6 pages)
- EX-5 (76 pages)
- 30A (30 pages)
- AmpMeter PDU (52 pages)
- EX30 (106 pages)
- 1100 Tower (36 pages)
- 40-75KVA (56 pages)
- 2000 (34 pages)
- 4000 RT (38 pages)
- Pulsar EXtreme C UPS 1500 VA (4 pages)
- FlexPDU 6 AUS (12 pages)
- 250A (34 pages)
- EX 1000 (28 pages)
- EX7 (18 pages)
- EX30Rack (24 pages)
- 12280 kVA (13 pages)
- 40-150kVA (56 pages)
- 100 (32 pages)
- Uninterruptible Power Provider (4 pages)
- EPS 7000 (62 pages)
- 300 (6 pages)
- EX10Rack (22 pages)
- 500 (4 pages)
- EPS 6000 (84 pages)
- S3 (64 pages)
- EX RT CLA (6 pages)
- 3000 (32 pages)
- 3.5 to 21 kVA N+1 (54 pages)