Inspection/setup – Multiquip MQ Power Whisperwatt 60HZ Generator DCA150USJ2 User Manual
Page 47
DCa150USJ2 60 hz generator • operation anD partS manUal — rev. #0 (08/22/11) — page 47
inspectiOn/setup
Refueling Procedure:
1.
level tanks — Make sure fuel cells are level with the
ground. Failure to do so will cause fuel to spill from the
tank before reaching full capacity (Figure 31).
Figure 31. Only Fill on Level Ground
Warning
Diesel fuel and its vapors are dangerous
to your health and the surrounding
environment. Avoid skin contact and/or
inhaling fumes.
CaUtion
alWaYS place trailer on firm level ground before
refueling to prevent spilling and maximize the amount
of fuel that can be pumped into the tank.
NOTICE
onlY use #2 diesel fuel when refueling.
2. Open cabinet doors on the “right side” of the generator
(from generator control panel position). Remove fuel
cap and fill tank (Figure 32).
Figure 32. Fueling the Generator
3.
never overfill fuel tank — It is important to read the
fuel gauge when filling trailer fuel tank.
DO NOT wait
for fuel to rise in filler neck (Figure 33).
Figure 33. Full Fuel Tank
Figure 34. Fuel Expansion
CaUtion
Do not overFill fuel system. Leave room for fuel
expansion. Fuel expands when heated (Figure 34).