beautypg.com

Ga-6hzr — preparation for long -term storage – Multiquip GA6HZR User Manual

Page 18

background image

PAGE 18 — GA-6HZR A.C. GENERATOR— OPERATION AND MANUAL — REV. #3 (03/30/11)

Generator Storage

For storage of the generating set for over 30 days, the
following is required:
 Drain the fuel tank completely.
 Run the engine until the gasoline in the carburetor is

completely consumed.

 Completely drain the oil from the crankcase and refill

with fresh oil.

 Remove the spark plug, pour 2 or 3 cc of SAE 30 oil

into the cylinder and crank slowly to distribute the oil.

 Slowly rotate the engine a few times with the starter

Rope and install a new plug.

 Pull out the starter rope slowly and stop at the

compression point.

 Clean all external parts of the generating set with a cloth.
 Cover the generating set and store in a clean, dry place.

GA-6HZR — PREPARATION FOR LONG -TERM STORAGE

This manual is related to the following products: