Demounting the Pump

9 Demounting

56 User Manual RKP-II (CA53461-001; Version 2, January 2010) © 2010 Moog GmbH

Pre-Conditions:

• The pump is idle:

Ö Chap. "7.4 Placing the Pump out of Operation", Page 52

• Demounting location is freely accessible.

• Machine / equipment is at zero pressure and zero voltage.

• Operating fluid has been inspected for risks and any necessary safety

precautions have been taken.

• Standard tools are available.

• Supplementary documentation is available.

Procedure:

1. Remove the electrical connections from the pump:

Ö Application Instruction RKP-D with CAN Bus Interface

2. Place the collecting tray for leaking operating fluid underneath the pump.

3. Remove the lines from the pump.

4. Completely drain the pump.

5. Attach the end caps and the flange covers to the pump.

6. Attach suitable lifting tackle to the pump.

Ö Chap. "5.2 Transporting the Pump", Page 29

7. Detach the pump with the coupling from the drive motor.

8. Place the pump onto a firm and stable surface.

9. Detach the lifting gear from the pump.

10. Detach the coupling from the pump's drive shaft in accordance with the

instructions provided by the coupling manufacturer.

11. Attach transport protection means for shaft ends to the pump's drive shaft.