Water Connections
1. Connect the hot water supply to the fill hose provided with a 3/4" NPT fitting.
2. Install a manual shut-off valve in the water supply line to accommodate servicing the
machine. The shut-off valve should be the same size or larger than the supply line and
installed as close to the dishwasher as possible.
3. Install a 3/4" pressure reducing valve (PRV) (supplied with machine) in the water supply
line, and set at 20-22 PSI/138-151kPa. Install the PRV downstream from the service
shut-off valve and as close to the dishwasher as possible.
Drain Connections
1. Drain hose must be supported by bracket provided (shipped inside of machine).
2. The drain hose bracket must be mounted a minimum of 2 feet above the finished drain,
either on the rear of the machine or on the wall.
3. The maximum height of the drain from the floor must not exceed 3 feet.
4. Connect the 3/4"I.D. flexible drain hose to a 1-1/2" wye (Y) drain fitting. Use a 3/4" hose
Plumbing Connections
Note:
Plumbing connections must comply with local health and plumbing codes.
Installation
Connect machine flexible
drain hose to a wye fitting.
Do not connect the machine
flexible drain hose to a
90° fitting.