beautypg.com

Belt tension adjustment – Murray FT6000X92A User Manual

Page 12

background image

12

F-041303L

BELT TENSION ADJUSTMENT

Proper belt tension is critical to good performance. After

half hour of operation, all cables may have to be adjusted

due to initial stretch. Thereafter, check tension after every

2 hours of operation.
To increase belt tension:
1. Loosen upper jam nut. Turn nut up cable in 1/8"

increments.

2. Tighten lower jam nut.
3. Check adjustment.
This procedure can be repeated until conduit adjustment

bolts have no more adjustment left. If no more adjustment

can be made, belt may have to be replaced.

ADJUSTMENTS

forward cable

upper jam nut

lower jam nut

1/4” stretch

beehive spring

tension spring link

Figure 4