beautypg.com

Operating procedure photos – MITSUBISHI ELECTRIC MSH-07NV User Manual

Page 69

background image

69

OPERATING PROCEDURE

PHOTOS

3. Removing the heat exchanger and the compressor

(1) Remove the rear panel.Remove the valve bed, and

open the rear panel to the rear to remove.

NOTE :

All panels are fixed by catches, and must be removed by
shifting up and down.

(2) Remove the screws of the right side panel and remove

it.

(3) Remove the screws of the rear guard and remove it.
(4) Remove the screws of the separator support plate and

remove it.

(5) Remove the screws of the motor support and remove

it.

(6) Remove the screws of the valve bed.

The valve bed is fixed by the catches on the right and
left sides.
Lift it to remove.

(7) Remove the electrical parts box.

Disconnect the connectors from the high pressure
switch, crank case heater, shell thermo, and fan motor
lead.

(8) Remove the screws of the separator and remove it.
(9) Remove the screws of the heat exchanger and remove

it.
Detach the welded point of pipe.

(10) Remove the nuts of the compressor and remove it.

Detach the welded points of the compressor suction
pipe and discharge pipe.

Photo 4

Photo 5

Photo 6

Compressor

Ball valve

Charge plug

Heat exchanger

Accumulator

Screws

Screws

OB207t-3qxp 25/9/97 9:05 PM Page 69

This manual is related to the following products: