Operating procedure photos – MITSUBISHI ELECTRIC MSH-07NV User Manual
Page 69
69
OPERATING PROCEDURE
PHOTOS
3. Removing the heat exchanger and the compressor
(1) Remove the rear panel.Remove the valve bed, and
open the rear panel to the rear to remove.
NOTE :
All panels are fixed by catches, and must be removed by
shifting up and down.
(2) Remove the screws of the right side panel and remove
it.
(3) Remove the screws of the rear guard and remove it.
(4) Remove the screws of the separator support plate and
remove it.
(5) Remove the screws of the motor support and remove
it.
(6) Remove the screws of the valve bed.
The valve bed is fixed by the catches on the right and
left sides.
Lift it to remove.
(7) Remove the electrical parts box.
Disconnect the connectors from the high pressure
switch, crank case heater, shell thermo, and fan motor
lead.
(8) Remove the screws of the separator and remove it.
(9) Remove the screws of the heat exchanger and remove
it.
Detach the welded point of pipe.
(10) Remove the nuts of the compressor and remove it.
Detach the welded points of the compressor suction
pipe and discharge pipe.
Photo 4
Photo 5
Photo 6
Compressor
Ball valve
Charge plug
Heat exchanger
Accumulator
Screws
Screws
OB207t-3qxp 25/9/97 9:05 PM Page 69