Maintenance – MGE UPS Systems 12280 kVA User Manual
Page 11

MGE UPS SYSTEMS
CleanWave - Installation and user manual
Page 11/13
Version 2.1 - 21/04/05 - (JME)
6. MAINTENANCE
After installation, the CleanWave
®
filter requires almost no maintenance.
We only recommend a periodic (e.g. annual) inspection.
This inspection must be done with no voltage by a qualified technician.
The working sequence is the following :
-
Switch off the power of the CleanWave
®
filter.
-
Open the housing in order to access the filter. In the case of the IP21 CleanWave
®
filter,
-
Unscrew and remove the lower part of the front panel (see fig. 3 and 7).
-
Check that there is no voltage on the terminals.
-
Visually check the general aspect of the filter, especially that there is no excessive dust on
the Lo and Zo chokes.
-
If necessary, clean the Lo and Zo with compressed air or with a vacuum-cleaner.
-
Check the tightening of the power terminals.
-
Close the housing.
-
Power up the filter.
- Pulsar EX 1000 (28 pages)
- 4.5 kVA (32 pages)
- 1100 (196 pages)
- EPS 8000 (54 pages)
- S EXB 2500 (22 pages)
- Pulsar Extreme 3200C (28 pages)
- ESV 22+Rack (24 pages)
- GES-801L (22 pages)
- Comet EX 7 RT 3:1 (38 pages)
- EX 11RT (72 pages)
- Galaxy PW (44 pages)
- 3 (34 pages)
- Pulsar TM 30 (18 pages)
- 22+ EB 22 (44 pages)
- 1500C (28 pages)
- Rackmount PDU (36 pages)
- Pulsar Esprit 313.5 kVA (6 pages)
- EX-5 (76 pages)
- 30A (30 pages)
- AmpMeter PDU (52 pages)
- EX30 (106 pages)
- 1100 Tower (36 pages)
- 40-75KVA (56 pages)
- 2000 (34 pages)
- 4000 RT (38 pages)
- Pulsar EXtreme C UPS 1500 VA (4 pages)
- FlexPDU 6 AUS (12 pages)
- POWER-SURE 700 (52 pages)
- 250A (34 pages)
- EX 1000 (28 pages)
- EX7 (18 pages)
- EX30Rack (24 pages)
- 40-150kVA (56 pages)
- 100 (32 pages)
- Uninterruptible Power Provider (4 pages)
- EPS 7000 (62 pages)
- 300 (6 pages)
- EX10Rack (22 pages)
- 500 (4 pages)
- EPS 6000 (84 pages)
- S3 (64 pages)
- EX RT CLA (6 pages)
- 3000 (32 pages)
- 3.5 to 21 kVA N+1 (54 pages)