beautypg.com

Initial preparation – Grindmaster Espressimo 2450 User Manual

Page 4

background image

Initial Preparation

Warning: To prevent damage to machine, boiler must be filled with water before turning main power switch on.

1.

2.

3.

4.

5.

6.

*Required to validate warranty. (See warranty for details).

Before operating the machine, please read the operation and instruction manual.

Needed for installation:




Remove machine from carton and position machine in operating location.

At this point, please refer to Installation Instructions on Page 6.

If there is a problem, consult the Troubleshooting Guide in this manual.

If you cannot correct a problem, call Grindmaster Corporation’s Hotline for help at 800-695-4500 or
+1-502-425-4776, Monday through Friday, 8 A.M. until 8 P.M., EST.

Access to cold water line with minimum of 30 P.S.I. pressure, drain, and heavy-duty grounded receptacle with its
own breaker. Models 2450 & 1750 use 115V, 20 AMP receptacle. Q models use 230V (3 wire plus ground), 20
AMP receptacle. E models use 230V, 15 AMP receptacles with proper plug installed by customer.

1

/

4

” copper tubing

(4)

1

/

4

” female flare fittings

In-line water filter system*

3

/

4

” ID flexible drain hose

IMPORTANT

Failure to use in-line water

filter voids warranty!

Page 3

Espressimo 2450 & 1750 Espresso Cappuccino Machines