ETL EDP70 User Manual
Page 32
![background image](/manuals/111578/32/background.png)
page
32 --
MI00/10056 rev. 8 —05/2006
5.1
Electrical connections
WARNING!
All electrical connections must
be made by a qualified electrician
and meet local electrical code standards
Before attempting to connect the mains supply, the reserve/bypass supply or the load, ensure that all supplies, including
the
battery,
are
isolated
and
that
all
the
equipment
switches
are
in
their
»OFF»
position.
Open UPS front access panel and remove internal panel over main switches and terminal blocks.
NOTES:
1) Installation must be performed by a qualified electrician. The terminals require the use of
the proper crimp tools and terminals in order to perform an installation in accordance with the
National Electrical Code (NEC). The recommended crimp tools, terminals and torque are shown
in the following tables:
2) Use Copper Conductors Only
Table 1 – T&B’s Cat. N°s. for terminals and crimp tools
Terminals
Hole for screw
Wire
Size
(AWG)
M6
M10
Toggle
hand
Nest
(stationary)
tool
Indentor
(Moveable)
8
D10711
D975
11803
6
E10711
E975
11803
4
F10711
F975
11805
3
F10711
F975
11805
2
G971
G974
WT117
11806
11802
1
G671
G974
11806
1/0
H971
H974
11807
2/0
J971
J974
11808
3/0
K971
K974
11809
4/0
L971
L974
11810
Table 2 – Recommended torque
Torque
Type
Screw
Wrench
(mm)
(Nm)
(lb.in)
Used ON
Entrelec
M 35/26.FF
M6
10
4.5
39
EDP70Plus
up to 24kVA
-------
M10
17
39
340
EDP70Plus
above 24kVA