Installation instructions, Direct connect applications, Remove junction box cover – GE AZ85H12DAC User Manual
Page 12: For 265 volt direct connect applications only, Attach conduit
REMOVE JUNCTION BOX COVER
• Remove the junction box cover by taking out the front
two screws.
1
Junction box
Installation Instructions
12
DIRECT CONNECT APPLICATIONS
FOR 265 VOLT DIRECT CONNECT
APPLICATIONS ONLY
IMPORTANT: Connection of a 265V AC product
to a branch circuit MUST be done by direct connection
in accordance with the National Electrical Code. Plugging
this unit into a building mounted exposed receptacle
is not permitted by code.
These models must be installed using the appropriate
GE power supply kit for the branch circuit amperage
and the electrical resistance heater wattage desired.
See the POWER CONNECTION CHART on page 13
to select the appropriate kit.
It is the responsibility of the installer to ensure
the connection of components is done in accordance
with electrical codes.
Direct connection to branch circuit wiring inside
the provided junction box must be made by connecting
as follows in steps 1–3 below.
ATTACH CONDUIT
• Use the round knockout hole at the top
of the junction box to install conduit coming
from the branch circuit. Install and clamp the conduit
through the conduit clamp and bring wire leads into
the junction box. Leave 8" of wire free from the end
of the conduit.
2
Conduit
FOR 230/208 VOLT DIRECT CONNECT
APPLICATIONS ONLY
Direct connection to branch circuit wiring inside
the provided junction box must be made by connecting
as follows in steps 1–3 below.
Connector
Conduit
clamp
Junction box cover