Voyager 3, Operations manual: installation, 2004 general binding corporation – GBC VOYAGER 3 930-032 User Manual
Page 27: Gbc films group

Operations Manual: Installation
Voyager 3
Voyager 3
2004 General Binding Corporation
Page 4-3
Figure 4.1.1 Suggested Floor Layout
MANUF
A
C
TURE OR FOR ANY O
T
HER PURPOSE
WITHOUT
WRITTEN
COPIED OR DISCLOSED IN
WHOLE OR IN P
A
R
T
, OR USED FOR
FOR ENGINEERING INFORMA
TION ONL
Y
AND SHALL NO
T BE
REPR
ODUCED
,
GBC PR
O-TECH CLAIMS PR
OPRIET
AR
Y RIGHTS
T
O
THE
MA
TERIAL DISCLOSED ON
THIS DRA
W
ING.
IT IS ISSUED IN CONFIDENCE
PERMISSION FR
OM GBC PR
O-TECH
PR
OPRIET
A
R
Y
C
GBC Films Group
4151 Ander
s
on Road,
DeForest,
WI 53532
This print is the pr
oper
ty of GBC Films Gr
oup.
The inf
ormation thereon is remitted in confidence
.
UNLESS O
THER
WISE SPECIFIED
T
O
LERANCE
DIM.
AS
SHO
WN
TO
L
.
+
1/64
+
.050
+
.020
+
.010
+ .005
X/X
X
XX
XXX
XXXX
ANGLES
+ 1D
FINISH
TO
B
E
125
TITLE :
D
A
TE :
D
RA
WN BY :
D
WG SCALE :
D
WG :
REVISION
CHECKED BY : GBC FILMS GR
OUP
Sug
g
ested Floor La
y
out
GBC V
o
y
a
g
e
r
3
Figure 4.1.1
N/A
SNF
10/31/02
> 2 ft.
(61 cm)
> 5 ft.
(152 cm)
> 2 ft.
(61 cm)
> 5 ft.
(152 cm)
16 ft.
(488 cm)
Detail A-A
Align heater with
edge of feeder motor
Air supply drop
Electrical drop
(Laminator)
W
a
ter supply drop
4 ft.
(122 cm)
3.5 ft.
(107 cm)
6 ft.
(183 cm)
Electrical (Europe):
- 400 V
a
c
- 50 hz
- 75 amps
- 3 phase (four wire)
Air:
- 8 Bar Max
(1
12 psi / 800 MPa)
- 10-12 CFM
(280-360 liters/ min.)
Wa
te
r:
(Recommended)
- T
a
p
water
- Drain return
Laminator Requirements
Electrical (US):
- 230 to 400 V
a
c
- 60 hz
- 100 amps
- 3 phase (four wire)
T
ransformer Required
- 230 to 400 V
a
c
- 3 phase (four wire)
Heater Requirements
See Heater Manual For
Details.
Electrical drop
(Heater)