beautypg.com

Installation instructions, Installation, Fuelbed arrangements – Stovax Ceramica Manhattan Wood Stove User Manual

Page 17

background image

5. FUELBED ARRANGEMENTS

Remove the cast iron door using the tool provided. The

main ceramic components are inside the firebox.
NOTE: THE CAST IRON DOOR IS HEAVY, TAKE EXTREME

CARE WHEN HANDLING TO AVOID DAMAGING THE

OUTER CASING.
The fuel bed consists of 5 logs and 2 ash panels. The logs

have letters A,B,C,D and E moulded into them for

identification.

5.7 Take the rear log A and place it up against the rear of the

fire sitting on the two flat ledges of the burner. The two legs

of the log should sit between the rear burner ports. See

diagram 14. Ensure an equal gap between each side of the

log and the side of the firebox.

5.8 Place log B on the left hand side of the burner with the

location bar on the underside of the log fully located in the

long slot of the burner. Make sure the log is as far to the left

as possible. See diagram 15.

5.1 Place log C on the right hand side of the burner with the

location bar on the underside of the log fully located in the

long slot in the burner. Make sure the log is as far right as

possible. See diagram 16.

17

5.2 Place log D across from the rear log A to log B on the left-

hand side. There are cut-outs in both logs for location. See

diagram 17.

5.3 There are two ash panels which lay across the front of the

burner skin. Place the panel with the flat edge facing the left

side of the firebox. There are location holes on this log

which fit over the screw holes of the burner skin.

INSTALLATION INSTRUCTIONS

INSTALLATION

14

AR1610

15

AR1611

16

AR1612

17

AR1613

18

AR1614