Installation instructions, Site requirements, 5 top flue up & out with additional bend – Stovax Ceramica Manhattan Wood Stove User Manual
Page 10: 8 optional extra flue lengths & bends
10
1.5 TOP FLUE UP & OUT WITH ADDITIONAL
BEND
Any additional bend may be used on the horizontal section
(either 45° or 90°) but the overall horizontal flue run will be
reduced.
Refer to diagram 4.
1.6 TOP FLUE VERTICAL KIT (8524/8524AN) -
ALL APPLIANCES
Vertical from the top of the appliance. (See diagram 5). A
minimum vertical rise of 3m (9'10") to a maximum of 10m
(32'10")
The basic kit comprises:
2 x 1m lengths
1 x 1m terminal lengths
1 x 52mm restrictor
1 x 47mm restrictor
Extra lengths may be added (see section 1.5), with reference
to diagram 4 and the installation instructions of the
appliance.
Refer to Table A under 3.3, Installation to identify when to
use each restrictor.
1.7 TOP FLUE VERTICAL OFFSET KIT
(8530/8530AN) – ALL APPLIANCES
Used with kit 8524 only, (see diagram 5). A minimum rise of
500mm (191/2") is required to the first bend.
1.8 OPTIONAL EXTRA FLUE LENGTHS &
BENDS
Nominal
Actual
Stainless
Anthracite
Length
Length
Finish
Finish
200mm
140mm
8527
8527AN
500mm
440mm
8528
8528AN
1000mm
940mm
8529
8529AN
45° Bend
N/A
8507
8507AN
90° Bend
N/A
8508
8508AN
Optional Flue Collar
N/A
8548
(Stoves Only)
INSTALLATION INSTRUCTIONS
SITE REQUIREMENTS
4
AR1300
5
AR1299