beautypg.com

Servicing instructions, Replacing parts, Magnetic safety valve 12 9. gazco flue sure system – Stovax Ceramica Coal Effect Stove Range Conventional Flue User Manual

Page 20

background image

20

6.5

Disconnect the ignition lead from the gas valve.

6.6

Undo the two bolts securing the gas valve to the appliance

and remove the valve.

6.7

Replace in reverse order.

6.8

Check all joints for gas leaks. Check operation of the

thermocouple and ignition lead.

7.1

Turn the gas supply off at the isolation device. Undo the

thermocouple connection from the back of the gas valve.

Pull the sensor leads clear and remove the interrupter

block.

7.2

Undo the magnetic valve-retaining nut from the back of the

control valve. Gently tap out the magnetic valve and replace

with a new unit. Replace the retaining nut and tighten. See

diagram 12.

7.3

Reassemble the interrupter block and leads. Secure the

thermocouple connection in the rear of the gas control. (Do

not overtighten). Turn the gas supply on and check the

entire pipework and valve joints for any leaks.

8.1

Turn the gas supply off at the isolation device. Locate the

main injector on the LH side of the airbox, undo the

compression nut and pull the pipe clear of the injector

body, see diagram 13, A.

8.2

Rotate the injector until it is fully removed, and install the

correct replacement injector. Reassemble and turn the gas

supply on, check for leaks.

.

If the stove has been installed in a restrictive location, it

may be necessary to remove the stove from its location.

9.1

Locate the sensor in the draught diverter opening, and

gently pull the two wires off the terminals. Undo the two

taptite screws and remove the sensor and the two plastic

spacers. See diagram 14.

9.2

Refit a new sensor ensuring the spacers are located between

the sensor and the bracket. Replace the two leads.

9.3

If it has been necessary to remove the stove, ensure that all

disturbed gas joints are checked for gas soundness when

reinstalled, and repeat the flue clearance test as detailed in

the Commissioning Section.

10.1 Turn the gas supply off at the isolation device.
10.2 Locate the aeration plate on the underside of the airbox

and remove the Nyloc nut, see diagram 15.

10.3 Remove the plate and replace with the correct size, ensure

that the hole(s) in the plate align correctly with the holes in

the underside of the airbox and replace the Nyloc nut.

SERVICING INSTRUCTIONS

REPLACING PARTS

8. MAIN INJECTOR

13

14

15

10. PRIMARY AERATION PLATE

AR0389

AR0381

A

7. MAGNETIC SAFETY VALVE

12

9. GAZCO FLUE SURE SYSTEM