beautypg.com

Installation instructions, Installation – Stovax Clarendon & Ashdon ASHDON 8546LUC-P8546LUC User Manual

Page 14

background image

14

3.1.5 To set the flue length, measure the total wall thickness, then

add 65mm. This total flue length will give the minimum

clearance of 50mm between the rear of the stove and the

wall. To cut the flue to length using a hacksaw, first insert

the square cardboard fitment into the flue. This will support

the inner flue. Cut through the flue and fitment. See diagram

2. ENSURE THE REMAINING FITMENT IS REMOVED

FROM THE FLUE.

File the cut edges of the flue smooth.

3.1.6 From outside, locate the flue assembly into the hole until the

terminal is flat against the wall. Ensure the terminal is

vertical. NOTE THE ORIENTATION OF THE TERMINAL.
See diagram 3. Mark the four fixing holes, remove the

terminal and drill the holes, inserting the rawplugs supplied.

DO NOT FIX THE FLUE AT THIS STAGE.

3.1.7 Position the stove ensuring all appropriate clearances are

observed.

3.1.8 Before fixing the flue in the wall, apply a bead of suitable

weatherproof sealant (silicone or similar) around the

perimeter of the back face of the terminal B Diagram 3.

Feed the flue through the wall ensuring it travels smoothly.

Working from inside, engage the flue in the inner and outer

spigots, making sure the rubber seals on the spigots are not

damaged.
From the outside, insert the four screws in the flanges of the

flue terminal ensuring the sealant has formed a water tight

joint to the wall. Finally secure the flue to the spigot by

drilling a 3.5mm hole through the larger hole in the spigot

and insert the stainless steel screw provided; refer to C in

Diagram 3.

Any terminal which is less than 2 meters above any access

(level ground, balcony or above a flat roof to which people

have access), is to be fitted with the guard supplied, see

diagram 4.

INSTALLATION INSTRUCTIONS

INSTALLATION

2

AR0630

3

AR0606

4

AR0603