3.8.4 Battery
connection
Q1
Q2
4
3
2
1
2
3
4
1
BATTERY
PE
_
+
SG
S
_
225
-30
0_
UPS
co
nne
cti
on
ba
tter
y_
01US
Fig. 3.8.4-1 Power connections Battery
Battery
+
Positive pole of the Battery –
Negative pole of the Battery
Do not insert the Battery Fuses before the commissioning.
Battery Cable Terminations are to the Positive and Negative Terminals as shown above.
Connect wire to the Lugs using appropriate tools and appropriate torque.
Torque specification for Input/Output and DC power connections on Bus Bars: See section 3.8.1.