Prepare the opening, Installation instructions – GE EER3000 User Manual
Page 3
3
Installation Instructions
PREPARE THE OPENING
See illustrations for all rough-in and spacing
dimensions.
The range may be placed with 0” clearance
(flush) at the back wall and side walls of
the cabinet.
NOTE: Use a 4
′ power cord to prevent
interference with the storage drawer.
Power cords 4
1
⁄
2
to 6
′ long may have to be
dressed to allow for proper drawer closing.
MINIMUM DIMENSIONS BETWEEN COOKTOP,
WALLS AND ABOVE THE COOKTOP:
**
* Make sure the wall covering, countertop
and cabinets around the range can
withstand the heat (up to 200°F)
generated by the range.
*
** Allow 30” minimum clearance between
surface units and bottom of unprotected
wood or metal cabinet, and 15” minimum
between countertop and adjacent cabinet
bottom.
*** Recommended spacing to heat-sensitive
surfaces.
2
2
1
⁄
2
”
2
1
⁄
2
”
7
1
⁄
2
”
25”
36”
30”
Acceptable electrical
outlet area.
Orient the electrical
receptacle so the length
is parallel to the floor.
*0”
**15” Min.
**30” Min.
*0”
***6”
Min.