Ch300 installation check sheet - continued – Furuno CH300 User Manual
Page 4
CH300 Installation Check Sheet - continued
CH304 or CH305 Hull Unit Check List
Check and note actual input voltage:
Are all cables and connections tight and strapped?
❏
Yes
❏
No
Is the unit grounded properly?
❏
Yes
❏
No
Has the EMI Core been added?
❏
Yes
❏
No
Has the soundome been lowered and raised by hand?
❏
Yes
❏
No
Have the shaft guides been adjusted for 0.5mm tolerance?
❏
Yes
❏
No
Does the shaft have a heading mark inscribed?
❏
Yes
❏
No
Is the soundome 1/2" up, in the sonar tube when retracted?
❏
Yes
❏
No
Has epoxy been used on shaft threads?
❏
Yes
❏
No
Has soundome packing sponge been removed?
❏
Yes
❏
No
Was oil added to the soundome?
❏
Yes
❏
No
**CAUTION - Do not lay soundome on its side once oil has been added**
Are all the soundome phillips head screws tight?
❏
Yes
❏
No
Have 3 layers of greased cotton packing been used?
❏
Yes
❏
No
Is the safety clamp installed and tightened?
❏
Yes
❏
No
Accessories Check List - if applicable
Checked operation of the SC-05WR external speaker?
❏
Yes
❏
No
Checked operation of the CH256 handheld remote control?
❏
Yes
❏
No
Sea Trial Information
Date:
Location:
Operator:
System Frequency:
Sea conditions:
Maximum detection range for the sea-bottom:
Maximum detection range for fish targets:
Has the sonar picture been checked for alignment?
❏
Yes
❏
No
Has the auto-retraction feature been checked?
❏
Yes
❏
No
Have the system manuals been given to the operator?
❏
Yes
❏
No
Was any hoist movement noted at maximum speed?
❏
Yes
❏
No
Operator Training
Date:
Location:
Trainer:
Training provided for:
Necessary Follow-up
Required for:
When:
Warranty Card Completed and Sent to Furuno USA
Date:
Page 2
Page 7