STEP 4
CHECKING WIRING AND PLUMBING: Check all wiring and
plumbing inside and outside of the wall to be sure none will be
broken where the hole is to be cut.
STEP 5
HOLE CONSTRUCTION: Depending upon size of unit to be
installed, lay out the hole dimensions per the chart below. Cut
and frame in hole to
¿nished dimensions. Use 2" x 4" material for
framing and follow the suggested typical installations in Figure
C, D, or E.
NOTE: IF THE WALL CONSTRUCTION IS TYPICAL FRAME
OR 2 x 4 STUDDING WITH BRICK OR STONE VENEERS,
LOCATE THE HOLE NEXT TO ONE OF THE STUDS. FOR
MASONRY, CONCRETE OR CINDER BLOCK WALLS,
LOCATE HOLE FOR CONVENIENCE.
NOTE: THESE DIMENSIONS ARE FOR FINISHED HOLE SIZE.
FINISHED
DIMENSION
SMALL
CHASSIS
MEDIUM
CHASSIS
LARGE
CHASSIS
A
16
3
»
16
"
18
3
»
16
"
20
3
»
8
"
B
26
3
»
16
"
26
3
»
16
"
28
1
»
4
"
CABINET
CAULK ALL SIDES
ELECTRICAL
RECEPTACLE
(SEE FIG. E FOR
LOCATION NOTE)
SHIM THE VOID
SPACE AT THE
TOP AND SIDES
WITH WOOD AS
REQUIRED
Figure C
FRAME WALL CONSTRUCTION
CAULK ALL SIDES
CABINET
SHIM VOID SPACES AT TOP AND
SIDES WITH WOOD AS REQUIRED
ELECTRICAL RECEPTACLE
(SEE FIGURE E FOR
LOCATION NOTE)
Figure D
BRICK VENEER CONSTRUCTION
MORTAR
ELECTRICAL
RECEPTACLE
POINT "X"
CABINET
CAULK
ALL SIDES
Figure E
SOLID MASONRY CONSTRUCTION
NOTE: ELECTRICAL RECEPTACLE LOCATION FROM
POINT "X" MUST BE WITHIN A MAXIMUM RADIUS OF
69" FOR 115V UNITS AND 45" FOR 230V UNITS.