beautypg.com

Installation – Hotpoint RFA60 User Manual

Page 4

background image

Installation

Levelling:
Level the fridge freezer when it is in its final location by adjusting the front feet, until
firm contact is made with the floor. This will stop rocking or vibration and keep the
doors aligned which helps the fridge freezer run reliably and efficiently.

Note: Before plugging in and switching on, leave the fridge freezer standing
in its final location for at least 15 minutes to allow it to settle.

Hinge Covers:
After the front feet have been adjusted and the fridge freezer is level fit the left and
right hand bottom hinge covers supplied.

To fit:

4

SAFET

Y &

INST

ALL

A

TION

Align the bottom hinge cover onto the
cover plate slots.

Push until the bottom hinge cover
clicks into place.

Defrost Tube:
A tube is supplied to help feed defrost water into a collecting vessel, ie. a bowl (see
‘Defrosting’ in the CLEANING & MAINTENANCE section).
For safe keeping until required, the tube can be stored in the floor of the freezer
compartment.

Floor of the freezer compartment

Defrost tube in storage position

This manual is related to the following products: