beautypg.com

Preparing to install the refrigerator, Preparing to install, The refrigerator , 15 – Hotpoint 22 User Manual

Page 14: Installation refrigerator instructions, Before you begin, Important, Models 22 and 25, Refrigerator location, Clearances, Rollers

background image

BEFORE YOU BEGIN

Read these instructions completely and carefully.

IMPORTANT –

Save these

instructions for local inspector’s use.

IMPORTANT –

Observe all

governing codes and ordinances.

Note to Installer –

Be sure to leave these

instructions with the Consumer.

Note to Consumer –

Keep these instructions

for future reference.

Skill level

– Installation of this appliance requires

basic mechanical skills.

Completion time

– Refrigerator Installation

15 minutes

Proper installation is the responsibility of the

installer.

Product failure due to improper installation is not

covered under the Warranty.

Do not install the refrigerator where the temperature

will go below 60°F (16°C) because it will not run often

enough to maintain proper temperatures.

Install it on a floor strong enough to support it fully

loaded.

REFRIGERATOR LOCATION

Installation

Refrigerator

Instructions

Models 22 and 25

Allow the following clearances for ease of installation,

proper air circulation and plumbing and electrical

connections.

Sides

1/8

″ (4

mm)

Top

1

″ (25

mm)

Back

1

″ (25

mm)

A door clearance of 3/4

(19 mm) is needed for a 90°

door opening which provides better access to the food

storage area.

CLEARANCES

The rollers have 3 purposes:

Rollers adjust so the door closes easily when opened

about halfway.

Rollers adjust so the refrigerator is firmly positioned on

the floor and does not wobble.

Rollers allow you to move the refrigerator away from the

wall for cleaning.

To adjust the rollers,

remove the base grille by pulling it

out at the bottom.

Turn the roller adjusting screws clockwise to raise the

refrigerator, counterclockwise to lower it. Use an

adjustable wrench (3/8

hex head bolt) or pliers.

To replace base grille,

line up the clips on back of grille

between the bar and the bottom of the cabinet. Push

forward until grille snaps into place.

ROLLERS

If the refrigerator has an icemaker, it will have to be

connected to a cold water line. A GE water supply kit

(containing tubing, shutoff valve, fittings and

instructions) is available at extra cost from your dealer,

by visiting our Website at www.Hotpoint.com (in

Canada, at www.geappliances.ca), or from Parts and

Accessories, 800.626.2002.

WATER SUPPLY TO THE ICEMAKER

(on some models

)

Questions? Call 800.GE.CARES (800.432.2737)

or

Visit our Website at:

www.Hotpoint.com

Questions?

In Canada, call 1.800.361.3400

or

Visit our Website at:

www.geappliances.ca

14

This manual is related to the following products: